Project Management

Project Management greatly simplifies procurement by reducing client management time and cost.

With ever increasing business demands, Project Management has come very much to the forefront today with one body or individual appointed to manage a project from start to finish.

Instructions are usually based on a brief from the client that specifies performance, cost, location and programme. Usually appointed at inception, our Project Managers can undertake feasibility studies, select the design team, programme the works, prepare drawings and obtain the necessary consents, produce tender documents, invite tenders and inspect the works through to cost budget and performance brief.

Our clients are kept informed throughout the project and will be called upon to make any necessary major decisions within the agreed programme.

Projects

Pocklington Arts Centre

Pocklington Arts Centre

Mason Clark Associates were commissioned to act as Project Manager, Principal and Lead Designer for this project, carrying out all the NEC3 contract administration under the YorBuild framework as well as all planning and building control submissions. Structural engineering, listed building works and Party Wall services were also provided for this refurbishment of the Pocklington Arts Centre. Learn more.

Water Tophill Birdhide

Water Tophill Birdhide

Mason Clark Associates have acted as Project Manager and CDM Principal designer on this project to create a two storey building to be used as a plush bird watching hide and education room. Learn more.

Dutch River Bridge

Dutch River Bridge

Mason Clark Associates carried out detailed design and project menagement for this award winning scheme to replace the bridge over Dutch River in Goole. Also included in the scheme were safety improvements to the junctions and approaches along with improvements to existing cycle and pedestrain facilities, and a range of environmental and sustainble features were incorporated into the scheme. Learn more.

Hessle Road Flyover

Hessle Road Flyover

Mason Clark Associates were commissioned by Hull City Council to assess the multi-span structure over the Hull to Cottingham railway line and develop a strengthening scheme.

The innovative scheme developed by Mason Clark Associates allowed all work to be undertaken from the highway and eliminated any possessions of the railway beneath.
Learn more.

Anlaby Acre Head Primary School Extension

Anlaby Acre Head Primary School Extension

Mason Clark Associates were commissioned by the school on the East Riding of Yorkshire Council framework to design and manage the construction of an extension.

Before work commenced, the school was flooded which also covered a large portion of the city of Hull during the flooding of summer of 2007 Learn more.

1 , 2