Grovehill Bridge Deck Replacement

Grovehill Bridge Deck Replacement

At the location of this lifting bridge over the River Hull the river is tidal and navigable. In order to allow shipping to pass the bridge lifts on a regular basis. The road across the bridge is an important route for local traffic.

MCA were commissioned by the East Riding of Yorkshire Council to design a new bridge deck to replace the existing timber sleeper deck. Learn more.

The Bank, Mumps - Oldham

The Bank, Mumps - Oldham

The proposed refurbishment of a former Bank and neighbouring retail unit comprised the conversion of the existing 3 storey building to apartments consisting of 2 and 3 bed dwellings, with additional 2 and 3 storeys of new build penthouse apartments Learn more.

Flood Assessment, Wentworth Drive, Goole

Flood Assessment, Wentworth Drive, Goole

Mason Clark Associates were asked by East Riding of Yorkshire Council to produce a robust 2D flood model to analyse what effect a breach of the flood defences of the River Ouse would have on a proposed nearby site.

The proposal was to develop the site at Wentworth Drive, Goole into an affordable residential development but due to the close proximity of the site to the River Ouse the planning application was rejected. Learn more.

Fifth Avenue School

Fifth Avenue School

This building was constructed to be a low carbon school and is set around a landscaped cloister, inspired by the existing school. The school is very environmentally focused and has wind powered heating with the electrical demand met by the on site wind turbines Learn more.

Len Hutton Drive

Len Hutton Drive

We were appointed to act for the developer to provide an expert opinion on whether the driveway dimensions to three newly built properties were adequate following a change in the plans which meant moving the building line forward a couple of metres. Learn more.